Uygulama
Prepare substrate by removing all loose and friable matter. Stop and fill where necessary. Ensure that the surface is clean, dry and sound.
New Work
Apply one coat of Terraco P Primer Textured and allow to cure. Apply Terraco Terracoat BT / Terracoat Sil BT / Terracoat Flex BT (select required performance option*) with a lambswool roller and then finish whilst still wet using a long-haired brush to give a striated lined finish, allowing for drying times between coats, as per approved architectural sample.
Redecoration
Protect all adjacent surfaces not to be covered. All cracks, chips, voids and damages should be repaired with an appropriate filler. Prepare by removing all loose and flaking paint, grease, dirt and grime. Spot prime exposed areas appropriately. Proceed as for new work.