Uygulama
Prepare substrate by removing all loose and friable matter. Stop and fill where necessary. Ensure that the surface is clean, dry and sound.
New Work
Apply a coat of Terraco P Primer Textured and allow to dry for 2-3 hours. Apply using a steel trowel, remove any excess material using the grain in the material as a guide. Allow material to set for 10-15 minutes, then finish surface by rubbing with a clean dry plastic trowel. Protect from rain for one hour.
Redecoration
Protect all adjacent areas not to be covered. All cracks, chips, voids and damages should be repaired with an appropriate filler. Prepare by removing all loose and flaking paint, grease, dirt and grime. Where necessary prime exposed areas appropriately. Proceed as for new work.